Skip to content

Product

Eight module groups, one platform, each with its status.

Syndeo is being rebuilt as one platform from the site to the progress billing, starting with cost and billing. Every group below says what is in development now and what is on the roadmap, with its phase.

Status key:In developmentPartly in developmentRoadmapPlanned add-on

What the phases mean

  1. P0

    First release

    The cost and billing core, documents, daily logs, punch list, S-curve, guest portals and the field app for Android phones, used first by design partners.

  2. P1

    Commercial launch

    The rest of the common core: RFIs, submittals, schedules and P6 import, procurement, quality and safety, and links to accounting systems.

  3. P2

    Mid-market and enterprise

    Enterprise controls, ERP connectors, AI features that are off by default, and the developer and public-works packs.

Phases are our current plan, in order, not dates we promise. We call a feature available once it ships, not before.

Billing Guard, in plain terms

Billing Guard checks and flags. The owner's engineer certifies.

Billing Guard is a feature inside cost and billing. It compares each progress billing with the accomplishment recorded against the BOQ and flags differences for a person to look at.

In development

What it looks at

  • Billed against the work

    Gross billed against gross certified value, as a share of the current contract sum and in pesos, alongside the accomplishment recorded against the BOQ.

  • Cash against value

    Cash paid against certified value less retention held. With an advance, cash can rightly run ahead by the amount still to be recouped, or by the bond still in force, so Billing Guard allows for that before it flags.

  • Certified, not yet billed

    For contractors: work the owner has certified that has not yet gone into a progress billing.

What it never does

It never approves, validates or certifies a billing, and it never moves money. A flag is a prompt to look, not a verdict. The owner’s engineer certifies. Before Billing Guard ships, a quantity surveyor and a CPA will sign off how it is defined.

Billing Guard on one contract

Contract PHP 11,200,000.00 including VAT, with a 15% advance

  • No flag: Billing No. 3: 40.00% billed, 40.00% recorded on site.

  • Watch: Billing No. 4: 60.00% billed, 56.50% recorded on site. PHP 392,000.00 billed ahead of the work.

  • Flagged: Cash paid runs ahead of certified value less retention by more than the advance still to be recouped.

Illustration with invented figures and tolerances, not a screenshot. Green, amber and red are kept for Billing Guard states.

The module groups

Cost and billing first, then the rest of the common core.

Each item carries its own status. In development means the rebuild is working on it now; roadmap means it is planned for the phase shown and not started.

  • Cost and billing

    In development

    Contracts, variation orders and progress billings worked out under Philippine rules, with the evidence behind every peso billed.

    • Contracts, with variation orders kept as child contracts with their own BOQIn development
    • Progress billings and subcontractor claims, with a retention ledgerIn development
    • Retention, advance recoupment, VAT and 2% EWT, with Form 2307 data for payor and payeeIn development
    • Billing Guard: checks each billing against recorded accomplishment and flags differencesIn development
    • Budget, commitments and an over- and under-billing viewRoadmap, P1
    • QAP and SAWT exportRoadmap, P1
    • Approved billings posted to QuickBooks or XeroRoadmap, P1
    • Connectors for SAP Business One and OdooRoadmap, P2
  • Project and document control

    Partly in development

    Projects, the company directory, documents and drawings in one place, with every version kept.

    • Projects and a company directoryIn development
    • Versioned documents and drawing setsIn development
    • Drawing markup, RFIs, submittals and meeting minutesRoadmap, P1
    • PCAB licence tracking and a permits registerRoadmap, P1
    • Transmittals and formal correspondenceRoadmap, P2
  • Field and site

    Partly in development

    What happened on site, recorded once, with photos attached.

    • Daily logs with photosIn development
    • A native field app for Android phones, built to keep working without signalIn development, P0
    • Custom forms and checklistsRoadmap, P1
    • Weather and suspension log tied to time extensionsRoadmap, P1
  • Time

    Partly in development

    Progress over time, weighted by what each part of the work is worth.

    • S-curve weighted by BOQ valueIn development
    • Gantt and look-ahead viewsRoadmap, P1
    • Primavera P6 and Microsoft Project importRoadmap, P1
    • Philippine holiday calendarsRoadmap, P1
  • Quality and safety

    Partly in development

    Defects found, assigned and closed, and safety records kept on time.

    • Punch list with plan pins and photosIn development
    • Inspections, incidents, toolbox talks and hazard analysisRoadmap, P1
    • DOLE reporting calendarRoadmap, P1
  • Commercial

    Partly in development

    The BOQ as the backbone, and buying against it.

    • BOQ with material and labour priced separately, imported from ExcelIn development
    • Material requests, a canvass of three quotations, and purchase ordersRoadmap, P1
    • Owner-supplied materials and subcontractor compliance documentsRoadmap, P1
  • Portals and portfolio

    Partly in development

    Owners, consultants and subcontractors working in the same record as the contractor.

    • Guest access for owners, consultants and subcontractors, at no chargeIn development
    • Maker-checker approvals with amount limitsRoadmap, P0
    • Portfolio dashboardRoadmap, P1
    • Developer pack: units, turnover inspections, defects liabilityRoadmap, P2
  • Insight and extras

    Roadmap

    Reports, exports and the controls larger companies ask for.

    • Reports, and Excel export of every tableRoadmap, P0
    • Public APIRoadmap, P1
    • Single sign-on and custom rolesRoadmap, P2
    • AI assistant with citations, off by defaultRoadmap, P2
  • Public-works pack

    A later add-on for contractors on government projects: the statement of work accomplished (SWA), geotagged and time-stamped evidence, the CPES pack, and government retention and withholding. Until then, Syndeo is being built for private work.

    Planned add-on, P2

Where Syndeo stops

What Syndeo will not do.

Knowing where a product stops is as useful as knowing what it does.

  • It does not hold or move money

    Syndeo records payments. Paying, escrow and wallets need licences it does not seek.

  • It does not keep your books

    Your accounting system or ERP stays the ledger. Syndeo is being built to post to it.

  • It does not issue BIR invoices in its first version

    It issues progress billings, titled as such and labelled as supplementary documents. Your invoices come from your own registered system.

  • It does not replace Primavera P6

    P6 stays the planner. Syndeo is planned to import the programme, never to force a second schedule.

  • It does not author BIM models

    Modelling and clash detection stay with the design tools built for them.

  • It does not fork for one customer

    One codebase for every customer. What a customer needs becomes configuration.

Comparing platforms?

Procore is a strong platform, with about 30 products, ISO/IEC 27001 certification and a SOC 2 Type 2 report. Syndeo is narrower today and holds no certification yet. Whichever you are looking at, ask the vendor to show you a Philippine progress billing: retention that stops at 50%, advance recoupment, 2% EWT on the amount net of VAT, and Form 2307.

Procore facts from procore.com and trust.procore.com, read on 2 October 2026.

Design partners

Run it on a live project with us.

Design partners bring one live private building project. We import the BOQ with you and build what your project shows we need.

Apply as a design partner